Client – Unusual Rigging
Venue – Newcastle Playhouse
Project – Custom Motor Control Systems
Architect – n/a
Consultant – Cameron Macintosh Consultants
Project Value – £60k
We were sub-contracted by Unusual Rigging to design an electrical motor control system to drive a series of winches above the Newcastle Playhouse stage, on behalf of Cameron Macintosh.
Working closely with Tom Redman at Cameron Macintosh and the Newcastle Playhouse technical team, we designed, engineered and installed delivered a custom turnkey solution to control flying systems in both the main auditorium and the Gulbenkian Studio Theatre.
Printable Version
|